Boston College - Multiple Projects

Project Summary

Over the past several years, S3 Design has completed a variety of Athletics and Recreation projects for Boston College.  The majority of these projects were coordinated with school breaks to minimize impact to student programs.  Schedule and project costs control were essential for the success of these projects, as well as coordination of finishes, fixtures and systems with lead times to meet the project schedule.

Varsity Team Locker Room Renovations
The locker room renovations included the varsity football, and men’s and women’s basketball lockers rooms.  The re-design provided new lighting, lockers with power/data and integrated LED accent lighting as well as improved team space with graphics and university branding.

Power Gym - Practice Facility
S3 Design assisted BC in the renovation of the basketball and volleyball practice facility with technical evaluation of the failing performance floor system.  S3 coordinated the replacement floor system and provided design services for the new BC court graphics which were subsequently used on the main practice court.

New Cycling Room - Flynn Rec Center
This project converted an underused racquetball court into a cycling studio.  The renovation provided an air-conditioned dedicated space for the activity that allows classes to occur without set-up and take-down time. The space is designed to create an environment conducive for spinning that has dimmable and colored lights to enhance the experience.

Additional BC Projects:
Floor Replacement - Quonset Hut
New Visiting Team Rooms - Conte Forum
Locker Room Renovations  - Flynn Rec Center

Watch as the Boston College football locker room gets some great new improvements.